Energy

In 10 years, the energy transformation will look simple. For now, ‘it can feel like a slog,’ says NextEra VP

In 10 years, the energy transformation will look simple. For now, ‘it can feel like a slog,’ says NextEra VP

Dive Brief: Grid operators and reliability coordinators must improve the interconnection and use of inverter-based resources on the bulk power system (BPS), or they risk disruption to electric reliabi…

2021/09/27